To provide a standard procedure for the proper sampling, logging, and storage of representative materials obtained for laboratory testing during roadway construction; provides a uniform method of guiding the sampling and testing. 1 0 obj 4 0 obj 0 %PDF-1.5 % Both the STRG and the Job Guide Schedule (JGS) are now part of the MAC application. What is a layer of material of not more than 6 inches compacted thickness for full width where a sample is gotten from? Earthwork Level 1 Study Guide Flashcards | Quizlet 2023 Field Sampling and Testing Manual; Past Field Sampling & Testing Manual. These documents contain the national/industry standards for the sampling and testing of materials. Density Log Book SoftwareThe Density Log Book Plot is a program which will prepare %PDF-1.7 Modified (used for subgrade and MSE walls) and Standard (used for embankment and structure). 4. PDF Section 10.1 FLORIDA SAMPLING AND TESTING METHODS - fdot.gov <> %PDF-1.5 % The reduction of voids creates what kind of changes in the material? Rerun the test with 1/2 and multiply the results by 2. =_x~K3ZYNz+Ghh_2> F!T|Ikia|3Yc=iG-qN-g`&x. PDF Field Sampling and Testing Manual Testing Procedures for All Tests Density Log Book for use on projects in the state of Florida. 3) Perform density test Control the level of quality being produced in the end product. Some MAC Specs do not apply to project acceptance, like those created for entering and tracking program samples. to our social media pages andnewsroom. To order copies, please visit:http://www.astm.org/http://www.transportation.org/aashto/home.nsf/FrontPage. Can the Density be more than 100% of Maximum Dry Density reported in the Proctor Test? stream Nominal Maximum Size Minimum Mass No. Feedback, The World's most comprehensive professionally edited abbreviations and acronyms database, https://www.acronymfinder.com/Sampling%2c-Testing-and-Reporting-Guide-(Florida-Department-of-Transportation)-(STRG).html, Safe Time for Recreation, Enrichment and Tutoring for Children (Chula Vista, CA), Storage and Retrieval by Content of Imaged Documents (European Strategic Program for Research in Information Technology), Storm Transfer and Response Experiment (National Oceanic and Atmospheric Administration), Science and Technologies of Russian Federation (Moscow, Russia), South Texas Research Facility (University of Texas; San Antonio, TX), Spectro-Temporal Receptive Field (auditory system), Storage Tank Registration Form (Florida Department of Environmental Protection), Spatio Temporal Region Graph (video indexing), Steuerung (German: Control, instead of CTRL on German keyboards), Submarine Tactical Requirements Group (US Navy), Statement of Total Recognised Gains and Losses. Florida Sampling and Testing Methods (Sorted By Subject)This document contains the Florida Department of Transportation procedures for the sampling and testing of materials. of concrete. >> Perform Independent Assurance tests with equipment other than that used by the project personnel. "global warming" %PDF-1.5 _4hF EnGFmu1p]Z= Construction contracts with roadway earthwork items shall have a what? 4 (4.75 mm) or smaller 300 g 3/8" (9.5 mm) 1000 g 3/4" (19.0 mm) 2500 g 1" (37.5 mm) 5000 g The sample size required for this test is a minimum after drying. 4) Record results in Earthwork Records System. %PDF-1.7 What is the purpose for the Sampling, Testing, and Reporting Guide? STRG stands for Sampling, Testing and Reporting Guide (Florida Department of Transportation) Suggest new definition This definition appears somewhat frequently and is found in the following Acronym Finder categories: Military and Government Science, medicine, engineering, etc. 2 0 obj PSP, HIPAA Examples: NFL, PDF Florida Department of TRANSPORTATION The following information has been provided to guide you in the materials acceptance process. Sample, sample size, and sample frequency can be found where? endobj Independent Assurance Performance Sample Schedule (PDF-33KB) Independent Assurance Proficiency Sample Test Reports. Obtain one sample of both fine and coarse aggregate for each 150 C.Y. Submit one sample of Documents and Publications - Documents and Publications Percent Maximum Density for base subgrade material modified is? <>/Metadata 1049 0 R/ViewerPreferences 1050 0 R>> Soil Dns. G - EFFERVESCENCE Updating <>/ExtGState<>/XObject<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 612 792] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>> Testing and Field Testing Professional (PDF-144KB) M - N . It should not stop standardizing after sitting in the sun. 10 days of submittal Construction TrainingThe Departments Construction Training 2 0 obj *Or until stabilized*. To obtain a copy of the documents listed below, please click on the appropriate hyperlink or contact the State Materials Office Earthwork Unit. 2 0 obj The QC plan must be submitted, by the contractor, how many days prior to starting work on any QC material? What test is a laboratory test which establishes a density standard that a Contractor must achieve a certain percent of, in the field for a given material? ,random Approved gauge and base material (limerock, shellrock, and cemented coquina) by Department. The sampling, testing and reporting of all materials used shall be in compliance with the Sampling, Testing and Reporting Guide (STRG) provided by the Department. Please note that the installation of the Density Log Book Plot software may require Administrative privileges. See other definitions of STRG Other Resources: 1988-2023, When the moisture is too high, what do you do?